12 January 2011 Traffic Problems WCRA Ed. Traffic Chaos predicted following Elm Bridge Closure Elm Bridge is closing for upto 6 months from the beginning of February 2011. Diversions are being put in place which will push traffic through Westfield as illustrated in the diagram below: Related Articles Residents urged to watch out for Deers on the Roads Posted On 13 April 2011 Hoe Valley Scheme has displaced deer onto the roads – motorists and nature lovers urged to slow down Construction Vehicles using Westfield Common as unloading bay Posted On 13 December 2013 Westfield Common is becoming a contractors’ loading/unloading strip. Two days running now. Westfield Way residents’ complain of road blockages Posted On 10 February 2014 Residents of Westfield Way have complained that Kingsmoor Park contractors are blocking their residential street as pictured below. Blocked in yet again this morning for…
Residents urged to watch out for Deers on the Roads Posted On 13 April 2011 Hoe Valley Scheme has displaced deer onto the roads – motorists and nature lovers urged to slow down
Construction Vehicles using Westfield Common as unloading bay Posted On 13 December 2013 Westfield Common is becoming a contractors’ loading/unloading strip. Two days running now.
Westfield Way residents’ complain of road blockages Posted On 10 February 2014 Residents of Westfield Way have complained that Kingsmoor Park contractors are blocking their residential street as pictured below. Blocked in yet again this morning for…